AIGC large model training

Project Overview


Large Language Model Training Infrastructure Requirements & Solutions


Our Supercomputing Center is at the forefront of computational infrastructure design, employing a sophisticated model that integrates high-density blade assemblies and advanced liquid cooling technology. This approach, which includes a pioneering immersion cooling design, centralized power distribution, and comprehensive resource management, is strategically crafted to surpass the limitations associated with conventional deployment strategies. By enhancing the deployment density of computing units and facilitating both central and edge distributed deployment, we ensure our infrastructure meets critical design criteria — exceptional energy efficiency, superior performance, unwavering reliability, optimal availability, and extensive scalability. This holistic and forward-thinking design philosophy positions our supercomputing center as a beacon of innovation and efficiency in the computational field.




AIGC solution panorama


Our AIGC solution is designed to offer a comprehensive suite of product capabilities, encompassing data center operations, resource platforms, network services, management platforms, and application services. This open, secure, and customizable solution empowers customers to maximize their current server resources while facilitating seamless integration with the public cloud for flexible expansion. The result is a significant reduction in costs and an increase in IT efficiency.


Furthermore, our data center hosting area provides users with a physically isolated environment, offering exclusive cabinets, networks, servers, and storage resources. This, paired with our robust security solutions and expert services, ensures uninterrupted user operations and peace of mind. Our AIGC solution is tailored to support the dynamic needs of businesses, ensuring reliability, security, and scalability at every turn.






Digital Globe AIGC Infrastructure solution architecture


·  The training area supports the maximum training task of 2048 cards, using high bandwidth and low latency design to improve the training efficiency

·  According to the scene characteristics of high read and write bandwidth, the storage area adopts the storage system design separating cold and heat, and supports FUSE and K8S CSI mount mode, that is, it can meet the training requirements and ensure the controllable cost.

·  The Inference and business area adopts public cloud, and the Intranet of the machine room is connected to provide elastic and scalable ones

·  Hybrid management provides logging, scheduling, and public network access capabilities






IB network layout


Project network topology

IB network layout







Storage solution



·Option:


Adopt cold and hot separation scheme, hot data is cached on GPU server and the cold data is stored by objects. maximize the idle CPU resources of GPU server to save cost.



·Advantages:


1.  Hot data cache in the GPU server NVME disk to maximize the computing force performance by pre-extracting.


2.  Provide FUSE and K8S CSI, and use the mode to facilitate computing power scheduling.


3.  Meet the needs of kcal-scale training, with the optimal cost.






Service operation guarantee after - sales service operation








Partnering with DGMY


Choosing DGMY means embracing innovation and sustainability in the digital age. Our services are at the forefront of technology, designed not just to meet the current needs of our clients but to anticipate and shape future demands. As we continue to explore and expand the boundaries of digital technology, we invite you to join us in this journey of discovery and excellence. Together, we can create a more connected, sustainable, and innovative future.


More Case
View All Case
Computing Center
Petrochemical Industry Innovation
oil and gas exploration equipment research and development、 exploration analysis and processing,etc.
View details
Computing Center
R&D Of Application Platform For Petroleum Exploration Industry
Our supercomputing solutions will provide comprehensive support for the digital transformation of oil/mining companies
View details
Get in touch with us today!
Ready toget started

The latest news, articles, and resources, sent to your inbox weekly